Insights
Setting up your dashboard 0 entities found · 6/29 branches scanned

Insights

Cycle time distribution

Time from first non-draft status to completion, across 0 completed items.

No completed work items yet. Once items reach done or fixed, cycle time analytics will appear here.

Throughput trend

Completions over the full history, bucketed daily.

Not enough history yet — need at least 2 days of completion activity to plot a trend.

Complexity calibration

Actual cycle time by planned complexity — is simple really simple? Are complex items over- or under-called?

No completed items with a complexity tag yet. Tag work items as simple, moderate, or complex to track estimation calibration.

Spec status flow & fan-out

Every spec with at least one derived work item, with its current status breakdown and a miniature status-flow chart showing how items moved through statuses over time.

SPEC-008 Unbuilt Runes — High-Level Spec
13 items 0% done
  • pending 13
No status activity yet
SPEC-094 Theme system foundations for multi-theme development
13 items 62% done
  • ready 3
  • done 7
  • fixed 1
  • pending 2
No status activity yet
SPEC-043 Refrakt MCP Server
9 items 0% done
  • draft 9
No status activity yet
SPEC-079 Semantic header zones + per-zone layout primitives for metadata-bearing runes
9 items 100% done
  • done 9
No status activity yet
SPEC-070 Collection rune
7 items 14% done
  • ready 3
  • done 1
  • pending 3
No status activity yet
SPEC-080 Block-and-layout rune assembly model
7 items 100% done
  • done 7
No status activity yet
SPEC-082 Typed node data channel
7 items 86% done
  • ready 1
  • done 6
No status activity yet
SPEC-031 Vite Plugin — Framework-Agnostic Rune Integration
6 items 0% done
  • ready 5
  • in-progress 1
No status activity yet
SPEC-084 Rune composability contract
6 items 83% done
  • review 1
  • done 5
No status activity yet
SPEC-085 Bento as a composition substrate
6 items 67% done
  • draft 1
  • ready 1
  • done 4
No status activity yet
SPEC-081 Declarative structure assembly
5 items 100% done
  • done 5
No status activity yet
SPEC-086 Surface chrome: elevation and frame presets
5 items 80% done
  • review 1
  • done 4
No status activity yet
SPEC-101 Hero cover layout — animated sandbox backgrounds
5 items 100% done
  • done 5
No status activity yet
SPEC-102 Standardised rune example fixtures
5 items 100% done
  • done 5
No status activity yet
SPEC-106 Image-src scheme sugar: placeholder: and icon:
5 items 100% done
  • done 5
No status activity yet
SPEC-107 Elevation, prominence & the surface-axis decomposition
5 items 0% done
  • ready 3
  • pending 2
No status activity yet
SPEC-001 Community Runes — Specification
4 items 0% done
  • ready 3
  • in-progress 1
No status activity yet
SPEC-002 Cross-Page Pipeline — Specification
4 items 0% done
  • ready 4
No status activity yet
SPEC-071 Plan site scaffolding
4 items 0% done
  • pending 4
No status activity yet
SPEC-076
4 items 75% done
  • draft 1
  • done 3
No status activity yet
SPEC-088 bg gradients and a formalized custom-CSS escape hatch
4 items 100% done
  • done 4
No status activity yet
SPEC-089 Cover layout for media+content runes: media-position="cover", content placement, and intrinsic height
4 items 100% done
  • done 4
No status activity yet
SPEC-091 Engine config variants: modifier-keyed config deltas
4 items 100% done
  • done 4
No status activity yet
SPEC-105 Scroll-reveal motion — a token-driven entrance dimension
4 items 0% done
  • ready 4
No status activity yet
SPEC-069 Plugin-contributed routes & declarative entity routing
3 items 0% done
  • ready 2
  • pending 1
No status activity yet
SPEC-083 Semantic chart data and pluggable renderer providers
3 items 67% done
  • draft 1
  • done 2
No status activity yet
SPEC-087 Surface fills: substrate patterns and tint-tracked inset surfaces
3 items 100% done
  • done 3
No status activity yet
SPEC-090 Media-guest interaction posture: presentational guests, clickable containers, cover backdrops
3 items 100% done
  • done 3
No status activity yet
SPEC-104 Live sandbox guests in the bg backdrop layer
3 items 0% done
  • ready 3
No status activity yet
SPEC-033 Structure Slots and Declarative Flexibility
2 items 0% done
  • ready 2
No status activity yet
SPEC-009 Rune Editor Compatibility Spec
1 item 0% done
  • ready 1
No status activity yet
SPEC-013 Multi-Framework Support: Layout Transform Architecture
1 item 0% done
  • in-progress 1
No status activity yet
SPEC-021 Plan Runes
1 item 100% done
  • done 1
No status activity yet
SPEC-030 Framework Adapter System
1 item 0% done
  • in-progress 1
No status activity yet
SPEC-062 Snippet rune
1 item 100% done
  • done 1
No status activity yet
SPEC-073
1 item 0% done
  • review 1
No status activity yet
SPEC-095 Explicit group ordering for registry-projection runes
1 item 0% done
  • ready 1
No status activity yet
SPEC-096 Editor registry awareness
1 item 0% done
  • ready 1
No status activity yet
SPEC-103 data rune — external tabular sources
1 item 0% done
  • ready 1
No status activity yet