Relationships
Implemented by 6
Related 36
Branches 9
Summary
The storytelling plugin is the best candidate for retirement in favour of author-defined composed runes (SPEC-145): eight runes, entirely domain-specific, with no consumer outside its own fixtures. This spec audits whether that is achievable, and finds it is — with three small additions and one relocation, two of which turn out to be adoption problems rather than missing capability.
It also argues for replace rather than delete, and treats that distinction as the substance rather than a caveat.
Replace, not delete
The obvious framing — remove plugins/storytelling/ before 1.0 — is the wrong one, because those runes are not a cost. They are the reference implementation and part of the drift-detection corpus: character, faction, lore, plot and realm are 5 of the 30 emitting runes in contracts/seo-baseline/, and that baseline is what proves SPEC-146's zero-diff gate and SPEC-145's no-drift criteria. Delete the plugin and the evidence that the replacement works goes with it.
So: reimplement storytelling as composed runes alongside the plugin, as a parallel fixture set, and require the composed output to be explained against the plugin's recorded baseline. Every bit of validation, none of the risk, and deletion becomes a separate one-line decision available at 1.0 or deferrable indefinitely.
This is ADR-035's argument applied to runes rather than themes: a format the reference implementation does not use is a format that rots. Storytelling is the largest coherent body of runes available to exercise composition, and exercising it is worth more than the lines saved by removing it.
What the plugin actually contains
2,106 lines: 319 config, 319 pipeline, 1,132 across the eight files in tags/ — of which common.ts is 122 lines of shared helpers, so the seven rune modules are 1,010 — and 336 elsewhere helpers and manifest. The imperative residue across all eight runes is one custom content model (storyboard) and one postTransform (plot).
| Rune | Status against what is specced |
|---|---|
lore | Clean — simplest shape |
bond | Clean — SPEC-144's edge declaration; already SPEC-145's worked example |
character | Registration ✓; its character-section child rune is replaceable by {% section %}; CSS caveat below |
realm, faction | Same shape; their split maps to {% card %}, not {% mediatext %} (measured, Finding 6) |
beat | Carried by plot's item model, not separately blocked |
plot | Two apparent blockers, both already have core primitives — see below |
storyboard | Genuinely blocked, and probably not a storytelling rune at all |
Finding 1 — plot needs no new primitive; it bypasses two that exist
The marker grammar is already core and already generic. checklist?: boolean (packages/transform/src/types.ts:444-449): "When true, the identity transform scans <li> text for [x], [ ], [>], [-] markers, strips them, and emits data-checked… Detection also applies generically to all list items." Those are plot's four beat markers exactly. Plot's itemModel regex /^\[(x|>|\s|-)\]\s*/ is a second implementation — plot wants the status as a typed attribute on beat, which is a real and different requirement, but the vocabulary was never plot's to invent.
The connected-sequence rendering is already core, and six runes use it. sequence?: 'numbered' | 'connected' | 'plain' (types.ts:451-455) emits data-sequence on <ol> via annotateSequence, which recurses through wrappers:
| Value | Runes |
|---|---|
connected | business/Timeline, places/ItineraryDay |
numbered | learning/HowTo, learning/Recipe, marketing/Steps, media/Playlist |
plot is the seventh and the only imperative one. The gap is one field lacking its sibling's shape: sequence takes a literal, while sequenceDirection two lines below takes { fromModifier: string; default?: string }. Plot needs the value keyed on structure === 'linear', so it reached for postTransform (plugins/storytelling/src/config.ts:243).
Giving sequence the form sequenceDirection already has deletes that postTransform — one of only four in the codebase — and is exactly ADR-036's pattern: the declarative sibling already exists, in the same interface, two lines away.
Finding 2 — storyboard does point at a new primitive, and it is justified by eight sites
convertStoryboardChildren (plugins/storytelling/src/tags/storyboard.ts:54) is flush the current group when a node matching a predicate appears, otherwise append. Stripped of domain, that is segmentation of a flat node sequence on a boundary node type.
It is the same shape as groupByHeading, which WORK-603 counts at seven sites — tint.ts:39, map.ts:138, palette.ts:132 and :282, spacing.ts:85 and :230, bento.ts:311. Storyboard is the eighth, differing only in boundary type: heading for seven, image for one.
Eight implementations across core and five plugins clears ADR-030 rule 5a's "three existing implementations" bar for a consolidating addition. And it is a content model, not a topology, so it belongs in SPEC-003's vocabulary:
content: type: segmented boundary: image # or: heading emitTag: storyboard-panel
This is better value than WORK-603's utility version of the same consolidation, because a declarative content model serves composed runes as well as TypeScript ones, while a utility serves only the latter. Worth weighing against WORK-603 rather than doing both.
Finding 3 — storyboard is not a storytelling rune
Once it is a segmented content model producing captioned panels, it contains no narrative content of any kind: it is a captioned-media container, which is gallery's neighbourhood. gallery does not do this today — its content model is plain body: any, greedy with an imperative transform — so a segmented model would plausibly simplify gallery rather than merely relocating storyboard.
Moving storyboard to core beside gallery removes it from this spec's scope entirely, which is the cleanest resolution: it stops being something the replacement has to cover.
Finding 4 — one capability would be silently lost
plugins/storytelling/src/pipeline.ts:268-318 does entity auto-linking: it walks the page, finds <strong> text matching a registered entity name, and wraps the first occurrence in a link to that entity's page — skipping headings, code, and nested runes.
SPEC-144 D2 explicitly excludes this: "this spec does not add a way to declare a postProcess sentinel resolution — that is where the remaining storytelling pipeline code lives, and it stays imperative." And core has no equivalent: its postProcess hooks cover expand, collection, aggregate, file-ref and breadcrumb, with no implicit entity linking anywhere.
So retiring the plugin as specced loses a feature. But the code is entirely domain-agnostic — nothing in it knows about stories — so the answer is to promote it to core, opt-in per entity type or per site. xref already exists as the explicit form, which gives this a natural name and home as the implicit one. Promoting it removes the blocker and gives every plugin a capability only storytelling has today.
Measured by WORK-625 (2026-10-08). The promotion has a constraint the plugin's walk does not meet. Today's walk skips nested runes and lets only the page's top-level rune through. A composed character places its author's prose inside {% card %}, which is nested, so the two cross-links the registry snapshot records inside character pages are not made. The core form has to treat a composition's placed primitives as part of the composed rune: for example, by keying on the slot markers (data-slot) rather than on data-rune depth.
Measured again by WORK-635. The loss follows from the primitive, not from composition. A composed lore places no primitive: its body slot sits directly in the composed rune's own <article>. So the snapshot's cross-link inside the lore page (Witch) is made, and the registry snapshot's links are reproduced exactly.
Finding 5 — the CSS has an answer, and it is ADR-035's companion
Lumina carries 413 lines across character, realm, faction, lore, plot, bond and storyboard. Most is shared-dimension routing already — character.css's own comment says "the title and the role/status def-list come from the shared dimensions; only the floated portrait avatar is character-specific chrome."
The distinctive remainder is real, though: a floated circular avatar, character-section's border-top separator, and plot's 106 lines. A composed rune ships no CSS (SPEC-145 D2), so naively this is a visual regression.
SPEC-145 D16 is the way out. contextModifiers keys on the parent's kebab data-rune, and a composed rune sets its own, so Lumina keeps the CSS and re-keys it: .rf-character__portrait becomes .rf-figure--in-character. A mechanical migration, not a loss, and no new mechanism. This is the strongest practical evidence that D16 was worth recording.
Finding 6 — two behaviours of the entity runes have no composed equivalent
Found when WORK-617 tried to move character, realm and faction onto SPEC-143's slot declaration and was cancelled. Most of what blocked that attempt is answered here already: the nested scene image is {% mediatext %}'s ordinary shape; extractScene's image-or-prose split is the split mediatext's own transform makes; and the section-type filter is {% section %}. Two behaviours were not covered. All three runes share them through buildStoryContent (plugins/storytelling/src/tags/common.ts:85).
Body content is kept only when there are no sections. buildStoryContent collects the rune's leftover body nodes. If no child is a section rune, they are appended to body. If any child is one, every non-section leftover is discarded:
if (!hasSections) bodyNodes.push(...sectionNodes.toArray());
So a paragraph an author writes between two {% character-section %} blocks renders without sections and vanishes with them. That is silent content loss of the kind BUG-028 fixed in figure, not a design. A Markdoc template cannot express it either way, because it is a conditional over the content. The composed runes will render that content. That is the correct behaviour and a recorded difference, not a regression to preserve.
Sections are also published as data-field="section". Each rune passes its section runes through properties as well as refs (...(hasSections ? { section: sections } : {})), so createComponentRenderable stamps data-field="section" on every child section rune. Nothing in the repository reads it: no schema row maps section, and neither the engine, Lumina's CSS nor the editor selects on it. The composed runes have no reason to reproduce it, but "nothing in the repo reads it" is not "nothing reads it". Downstream themes or tooling may select on it, so dropping it is a difference to state, not to skip.
Neither needs a new primitive. Both are differences under D2, and they are named here so they are explained rather than rediscovered.
Measured by WORK-636 (2026-10-08). Two corrections, from composing realm and faction.
The loss is wider than "only with sections". The plugin's preamble fields are scene, description (paragraphs) and items (tags). A list written after the description matches none of them. It is dropped, and so is everything after it (a {% hint %}, say), whether or not sections follow. The composed runes' catch-all body keeps all of it.
The split does not map to {% mediatext %}; it maps to {% card %}. The table above and this finding's opening both say it does. Measured over the same definition, mediatext fails three ways:
- It speaks
align/ratio.realmandfactionacceptSplitLayoutModel'smedia-position,media-ratio,valignandcollapse, and the baseline fixtures writemedia-position="start". A template cannot pass those through, andtop,bottom,cover,valignandcollapsehave no counterpart. - It renders an empty media zone when there is no scene.
- It moves every image-only paragraph into its media zone. An image the author wrote in the description leaves the body and loses its
data-slot. The plugin takes only the first paragraph as the scene.
card has none of these problems. It carries SplitLayoutModel, it has D17's empty-zone guard, and it splits only on the template's ---. That is SPEC-145 D18's conclusion: card is the canonical media-split primitive, and mediatext is outside the eight. Both definitions place card, as character does.
Decisions
D1 — replace alongside, delete separately
The composed implementation ships beside the plugin, with its own fixtures, and the plugin stays until a later explicit decision. Deletion is not part of this spec's scope and does not gate 1.0.
D2 — the composed output is compared against the plugin's baseline, difference by difference
Not "byte-identical" — the arrangements will differ, deliberately ({% section %} in place of character-section, {% card %} in place of the split). The gate is that every difference is explained, in the same spirit SPEC-145 sets for its own spike. The 5 storytelling fixtures already in contracts/seo-baseline/ are the reference.
D3 — storyboard leaves storytelling rather than being composed
It is a captioned-media container, not a narrative rune (Finding 3). Relocating it to core beside gallery is a smaller and more honest change than composing it in place, and it removes the hardest item from this spec.
D4 — two of the four blockers are adoption, not absence, and are treated as such
checklist and sequence both exist and are in use. Plot's bespoke versions predate or bypass them. The work is a one-field extension plus a migration, not a new primitive — and stating that distinction is the point, because proposing a primitive that already exists is the failure mode this audit hit twice before catching itself.
D5 — entity auto-linking is promoted to core before the plugin is retired
Not reimplemented per-composition and not dropped. It is domain-agnostic already, and xref gives it a name as the implicit counterpart to the explicit form.
D6 — the composed runes keep all authored body content, and drop the section field stamp
Finding 6's two behaviours are not reproduced. Content written alongside sections renders in the composed runes, where the plugin discards it. The plugin is not patched to match: D1 keeps it unchanged, and its baseline records today's output. The data-field="section" stamp is not emitted. Both are differences explained under D2. The stamp's removal is also named in the changeset that ships the composed runes, because it is the one difference a downstream consumer could notice in markup.
Status after v0.40.0
Two of the thirteen criteria have work behind them, and this spec stays draft. WORK-624 composed bond and WORK-625 composed character. Both ship beside the plugin as test fixtures (D1), and every difference from the plugin is explained (D2). plan validate suggests advancing to implemented because both linked items are done. They cover only the two slices, so that warning is expected until the rest of the runes are composed.
Implementation notes, deliberately not yet work items
Kept here rather than filed, so the milestone that adopts this decides its own breakdown rather than inheriting dangling items. Four pieces, in dependency order:
sequencegains{ fromModifier, default }— the shapesequenceDirectionalready has, in the same interface. Deletesplot'spostTransform. Small, and independently useful to any rune wanting a modifier-keyed sequence style.- A
segmentedcontent model in SPEC-003's vocabulary, with a boundary node type. RetiresgroupByHeading's seven loops as well as unblockingstoryboard; weigh against WORK-603's utility form rather than shipping both. - Entity auto-linking promoted to core, opt-in, as implicit
xref(Finding 4). storyboardrelocated to core besidegallery, using (2) (Finding 3).
Plus the dependency chain this spec sits on: SPEC-146 → SPEC-145, with SPEC-144 independently.
Non-goals
- Deleting
plugins/storytelling/— explicitly out (D1) - Gating 1.0 on the deletion; this spec gates only on the replacement existing and being explained
- Retiring any other plugin — the same audit would have to be run for each, and their shapes differ
- Composing
storyboard(D3) - Declaring
postProcessin general; only the one named capability is promoted (D5) - Changing
checklistorsequence's existing semantics — the extension is additive
Acceptance Criteria
- Every storytelling rune except
storyboardexists as a composed rune, with fixtures - The composed fixtures are compared against the plugin's recorded baseline and every difference is explained in writing (D2)
plugins/storytelling/is unchanged and still passing its own tests at the end of the work (D1)plothas nopostTransform, and its sequence style is declared viasequence's modifier-source formplot's beat markers resolve through the corechecklistdetection rather than a rune-local regex, or the reason they cannot is recordedgroupByHeading's seven sites are retired by the samesegmentedmodel that unblocksstoryboard, or the decision to keep both forms is recorded with its reason- Entity auto-linking works for a non-storytelling entity type, proving it is domain-agnostic (D5)
storyboardrenders from core with its existing fixture unchanged (D3)- Lumina's storytelling CSS is re-keyed through
contextModifiersand the composed runes render with no unstyled regressions, or each accepted visual change is listed - A composed
character,realmandfactionwith both sections and other body content renders that content, and the plugin's discarding of it is recorded as an explained difference (Finding 6, D6) - The composed runes emit no
data-field="section"on their sections, and the changeset shipping them names the removal (Finding 6, D6) - The
sequenceadoption count is re-measured after the work — six runes today; a seventh that still hand-rolls it is a finding, not a detail - The rune authoring guide states the standing rule: measure adoption of an existing primitive before proposing a new one (D4)
References
SPEC-145 — composed runes; the mechanism this exercises, and D16's CSS answer
SPEC-144 — entity and edge registration; covers storytelling's
register/aggregateSPEC-146 — name resolution across boundaries; a dependency of SPEC-145
ADR-037 — users author composed runes only; why this is the shape of the replacement
ADR-036 — name the pattern, do not open a language; the rule Finding 1 follows
ADR-030 — arrangements and variants; rule 5a, the bar Finding 2 clears
ADR-035 — a format the reference implementation does not use is a format that rots;
rejected, and now its own best exampleSPEC-003 — the declarative content model the
segmentedaddition belongs toWORK-603 —
groupByHeading's seven sites, and the utility form to weigh againstSPEC-148 — the places audit; the second data point for the misfiled-capability finding, and the per-property method this spec predates
SPEC-149 — the business audit; a plugin with no misfiled capability, qualifying the pattern to "at most one"
SPEC-150 — the design audit; contrasts this spec's promotable
postProcessagainst one that correctly stays plugin codeSPEC-154 — the learning audit;
glossaryis the unboundedpostProcesscase, against this spec's bounded oneSPEC-158 — the identity guard's granularity, settled alongside SPEC-144 D2's revision
WORK-617 — cancelled; the slot-declaration attempt on the entity runes whose evidence is Finding 6
BUG-028 —
figure's silent content loss, the same kind as Finding 6's first behaviourSPEC-159 — chrome as intent;
storyboard'svariantis removed there, and its chrome is measured to survive composition regardless