Work

Work Items

110 of 110 items
Draft 45
WORK-159 main
Unified RefraktConfig types, loader, and JSON Schema
Promote refrakt.config.json from a site-only file into the unified root config defined in ADR-010. Add type-level support for plugins, plan, site, and sites, normalize the three valid input shapes (flat / singular site / plural sites) into a canonical internal form, and publish a JSON Schema so editors can autocomplete and validate the file.
high moderate
0/10 criteria
WORK-160 main
Add discoverPlugins() helper to @refrakt-md/cli
Replace the lazy runPlugin import-on-demand pattern in packages/cli/src/bin.ts with a first-class discoverPlugins() helper that returns the full set of installed plugins. The helper has four consumers in v0.11.0 — CLI dispatch, refrakt --help, refrakt plugins list, and the new MCP server — and centralizing the logic eliminates three different implementations of the same scan.
high moderate
0/10 criteria
WORK-161 main
Extend CliPluginCommand with inputSchema/outputSchema/mcpHandler
Add three optional fields to the CliPluginCommand interface so plugin commands can declare structured input/output schemas and an MCP-friendly handler that bypasses argv parsing. Existing plugins keep working unchanged — the fields are purely additive.
high simple
0/5 criteria
WORK-162 main
Refactor runPlugin dispatch to use discoverPlugins
Switch the CLI's plugin dispatch in packages/cli/src/bin.ts from blind import('@refrakt-md/<namespace>/cli-plugin') to a discoverPlugins() lookup. This produces a friendlier "did you mean?" error when a namespace is misspelled (since we know the full set of installed plugins) and centralizes plugin loading on the new helper.
high moderate
0/5 criteria
WORK-166 main
Framework adapters accept site option
Update all five framework adapter packages — @refrakt-md/sveltekit, @refrakt-md/astro, @refrakt-md/nuxt, @refrakt-md/next, @refrakt-md/eleventy — to accept a site?: string option. Each adapter resolves its target site via the shared normalizer from WORK-159, then reads contentDir, theme, target, packages, routeRules, icons, backgrounds from the resolved site entry instead of the top-level config. Single-site projects and the legacy flat shape continue to work without changes; multi-site repos pick a target per adapter.
high moderate
0/12 criteria
WORK-167 main
Add inputSchema + mcpHandler to plan commands
Wire the @refrakt-md/plan CLI commands with the new schema fields from WORK-161 so the MCP server exposes them as cleanly typed tools. Each command gets a JSON Schema for its inputs and an mcpHandler that bypasses argv parsing and accepts a structured object directly.
high moderate
0/7 criteria
WORK-168 main
Plan package consumes unified config (init scaffolds, serve/build read paths)
Wire @refrakt-md/plan to the unified refrakt.config.json. plan init scaffolds the config (creating it or extending an existing one with a plan section), and plan serve / plan build / other plan commands read plan.dir from the loaded config instead of relying solely on the --dir flag and defaults. The plan section currently exposes only dir; specs path remains derived from dir (a child folder), and surfacing it as a config field can come later if real-world projects demand it.
high moderate
0/8 criteria
WORK-169 main
Scaffold @refrakt-md/mcp package with stdio entry, auto-detect, and core tools
Create the @refrakt-md/mcp package: stdio MCP server entry point, auto-detection of plan and site contexts from the unified config and the filesystem, and the initial set of core CLI-mirroring tools (refrakt.inspect, refrakt.contracts, refrakt.validate, refrakt.reference, refrakt.package_validate).
high complex
0/9 criteria
WORK-170 main
MCP plugin tools (via discovery) and resources
Wire plugin-contributed tools (notably the @refrakt-md/plan commands) into the MCP server via discoverPlugins(), and implement the read-only resources (refrakt://detect, refrakt://reference, refrakt://contracts, refrakt://rune/<name>, refrakt://plan/*) so agents that prefer pull semantics have first-class URIs.
high moderate
0/8 criteria
WORK-263 main
Collection rune: query engine and built-in layouts
The collection rune core — a sentinel-emitting schema plus a postProcess resolver that queries the registry (filter/sort/group/limit) and renders the built-in layouts, with the pinned $item bound-variable contract and the per-layout body interpretation.
high complex
0/7 criteria
WORK-268 main
entityRoutes config-rules adapter
The built-in adapter (in @refrakt-md/content) that turns site.entityRoutes into contributed pages: selects entities by type + filter, substitutes placeholders, renders an inline render string or a render-template partial per entity with $item bound, and back-fills sourceUrl.
high complex
0/6 criteria
WORK-270 main
Plan entity embeddability (sourceFile + extract)
Make plan entities embeddable so {% expand $item.id /%} renders their bodies in entityRoutes detail pages. The plan register hook currently sets sourceUrl only; add sourceFile and an extract that returns the entity rune's transformed body. This is the prerequisite the SPEC-071 dogfood depends on.
high moderate
0/4 criteria
WORK-272 main
refrakt plan site dogfood
Wire refrakt's own plan/ as a sites.plan site and author its plan-site/ content, proving that entityRoutes + collection replace the bespoke plan serve. This is the milestone's proof-of-practice.
high complex
0/4 criteria
WORK-005 main
Build stat Rune
medium
WORK-006 main
Build math Rune
medium
WORK-007 main
Build concept Rune
medium
WORK-008 main
Build exercise Rune
medium
WORK-010 main
Build glossary Rune
medium
WORK-018 main
Build video Rune
medium
WORK-163 main
refrakt --help lists installed plugins + new refrakt plugins list command
Surface the installed plugin set in two places: the top-level refrakt --help output (so users discover available namespaces without reading docs) and a dedicated refrakt plugins list command (canonical machine-readable output for tooling, including MCP clients debugging their setup).
medium simple
0/6 criteria
WORK-164 main
Add --site flag to site-scoped CLI commands
Site-scoped commands (inspect, contracts, validate, scaffold-css, package validate) need to know which site they are operating on when the project declares multiple. Add a --site <name> flag that selects an entry from the normalized sites map; for single-site projects the flag is optional and resolves to the lone entry.
medium moderate
0/7 criteria
WORK-172 main
Migrate this repo's site config to the unified root config
Move site/refrakt.config.json to a unified refrakt.config.json at the repo root, declaring plugins, the plan section, and sites.main (or whatever name we settle on) for the existing site. Validates the design against our own project and gives us a multi-site-ready structure for any future additions (separate plan dashboard site, blog, etc.).
medium simple
0/9 criteria
WORK-173 main
Update create-refrakt scaffolds for the unified config shape
create-refrakt currently writes a flat-shape site/refrakt.config.json for site projects and (via plan init) no config at all for plan projects. Update both paths to produce the new unified root-shape config — site projects get a sites.main section, plan projects get a plan section, and any combined scaffolds (future) declare both.
medium moderate
0/8 criteria
WORK-174 main
Site docs — configuration section
Document the unified refrakt.config.json at site/content/docs/configuration/. Cover the three valid shapes (flat / singular site / plural sites), each section (plugins, plan, site/sites), the multi-site workflow, and the migration story for existing flat-shape configs.
medium moderate
0/5 criteria
WORK-175 main
Site docs — MCP + plugin authoring update + CLAUDE.md pointer
Document the new @refrakt-md/mcp server (registration, tool reference, resource reference) at site/content/docs/mcp/, update the existing plugin authoring docs to cover the new cli-plugin schema fields (inputSchema, outputSchema, mcpHandler), and add a brief pointer in the root CLAUDE.md so AI agents know the MCP server exists when registered.
medium moderate
0/5 criteria
WORK-264 main
Collection heading-delimited table columns
The rich-table path: a table collection's body uses the sections content model (heading = column separator + label, body = per-cell markdoc template with $item), with collection owning the <table>/<thead> and row alignment.
medium moderate
0/4 criteria
WORK-271 main
create-refrakt plan-site scaffold
Add a plan project type to create-refrakt that scaffolds a complete, runnable plan site: config (plugin + entityRoutes), a seed plan/, and a plan-site/ content dir (layout + dashboards), for a chosen adapter target.
medium moderate
0/5 criteria
WORK-355 main
Generate theme scheme stylesheet from tokens.ts (retire hand-authored dark.css + tint.css palette copies)
The Lumina dark/scheme palette is hand-authored in three places that must be kept in lockstep by hand:
medium moderate
0/6 criteria
WORK-430 main
bg sandbox guest — docs + showcase
SPEC-104 §6 + docs: document the bg guest body, the bare-surface guardrail, the sandbox preset (with the refrakt.config.json example), and the boot-frame layering; ship the music-blog backdrop pattern as a working showcase exercising the layout-cascade + SPEC-006 audio-bridge composition.
medium moderate
0/4 criteria
WORK-441 main
Gallery loads the assembled theme config (not just base + plugins)
The static gallery (the visual-regression harness from WORK-409) transforms pages with merged.config — i.e. coreConfig plus the enabled plugins' configs — but never calls assembleThemeConfig. The site assembles core → plugins → theme so theme-level overrides reach the engine; the gallery does not, so it can only ever render base output.This is a latent gap in the regression net: any override a theme applies via mergeThemeConfig (tints, icon swaps, and — after WORK-425 — per-rune defaultElevation/defaultProminence deltas) is invisible in the gallery. The gallery shows what a plugin ships, not what a theme actually renders.Not a blocker for WORK-425. Under the agreed Option A, base surface defaults live in core + plugin configs, which the gallery already loads, so default data-elevation/data-prominence emission is gallery-verifiable today. This item only matters once a theme overrides those defaults (Lumina currently inherits the base defaults unchanged).
medium simple
0/4 criteria
WORK-009 main
Build quiz Rune
low
WORK-011 main
Build prerequisite Rune
low
WORK-012 main
Build objective Rune
low
WORK-013 main
Build partner Rune
low
WORK-014 main
Build job Rune
low
WORK-016 main
Build album Rune
low
WORK-017 main
Build artist Rune
low
WORK-165 main
Lint cli-plugin shape in refrakt package validate
Add a lint pass to refrakt package validate that checks a package's cli-plugin export for structural issues — missing namespace, missing descriptions, malformed inputSchema, namespace conflicts with already-installed plugins. Catches problems at package-publish time rather than at runtime when the MCP server tries to advertise the broken tool.
low simple
0/7 criteria
WORK-171 main
Add refrakt config migrate command
Add a small migration command that rewrites a flat-shape refrakt.config.json into the nested form (site.* and explicit plugins). Optional for users — the flat shape stays valid indefinitely — but useful for projects adopting the unified config or moving to multi-site.
low simple
0/8 criteria
WORK-266 main
article-card reference card rune
The first core plain-presentational card rune — ordinary attributes, no $item/registry knowledge — shipped as the reference implementation for collection body templates. Proves the "cards are plain runes; the template wires entity fields into attributes" model.
low simple
0/4 criteria
WORK-273 main
Deprecate plan build and serve commands
Mark plan build and plan serve deprecated, pointing users at the site approach, once refrakt's own plan site proves the replacement. Keep the authoring CLI. Removing the bespoke render stack is a later release, out of scope here.
low simple
0/3 criteria
WORK-334 main
Chart renderer provider selection and additional providers
Demand-driven follow-up to the WORK-333 seam: ship renderers beyond the built-in svg (e.g. a charting library) and the SSR capability, on the provider model resolved in SPEC-083.Status: draft — demand-driven (not blocked). The provider model is settled (single rf-chart delegating to an app-registered ChartProvider; selection author → site-default → svg; theme orthogonal via tokens). This item only makes sense once there's a concrete need for a second renderer — building one speculatively is the YAGNI trap SPEC-083 warns against.
low unknown
0/6 criteria
WORK-343 main
Schema-declared achieved status for open-world rollups
The deferred "option B" from the WORK-296 achievement-status discussion. Today plan-progress computes its achieved subset with a hardcoded union of terminal statuses (value="status:/^(done|fixed|accepted|complete)$/", decision C). That is correct and minimal, but it bakes domain knowledge into the plan sugar and relies on achieved-status name uniqueness across types — which holds for the five first-party plan types but is not guaranteed for a third-party "trackable" type that introduces its own status lifecycle.This item makes achievement self-declared on each rune's schema so aggregate can derive the achieved set generically, the same open-world way SPEC-084 handles composability (knowledge lives with the party that has it).
low moderate
0/4 criteria
WORK-354 main
Responsive per-cell bento spans
Deferred granular follow-on to the bento collapse model (WORK-348). Once grid-level collapse + automatic progressive reduction are in place, the remaining need is per-cell responsive control — letting an individual tile declare its span per breakpoint.
low moderate
0/3 criteria
WORK-500 main
Retirement-candidate pass over pending unbuilt runes
Once cancelled / superseded exist, review the plan corpus for items that should be retired rather than left dangling. The main pool is the 13 pending work items, all sourced from SPEC-008 (unbuilt runes): stat, math, concept, exercise, glossary, objective, prerequisite, quiz, partner, job, album, artist, video. A reviewed, per-item judgment pass — not an automated flip.
low simple
0/5 criteria
Ready 31
WORK-055 main
Learning Package Pipeline Hooks
high complex
0/11 criteria
WORK-094 main
Create @refrakt-md/vite plugin — Level 1 static transform
Build the core Vite plugin that intercepts .md files and emits JS modules with rendered HTML, frontmatter, SEO data, and serialized tree. This is the Level 1 (static, per-file) integration — no cross-page awareness.
high moderate
0/13 criteria
WORK-095 main
Vite plugin — virtual CSS module and tree-shaking
Implement virtual:refrakt/styles module that imports theme tokens, per-rune CSS, and package CSS. Supports tree-shaking to include only CSS for runes actually used in content.
high simple
0/9 criteria
WORK-261 main
Shared field-match parser
Implement the canonical field:value selector grammar from SPEC-070 as a single shared module in @refrakt-md/runes, consumed by collection, entityRoutes (SPEC-069), and backlog. The existing plugins/plan/src/filter.ts folds into it, gaining glob/regex, url resolution, and case-consistency while preserving backlog behavior.
high moderate
0/7 criteria
WORK-262 main
Deferred-body capture for per-entity templates
Implement the deferBody mechanism SPEC-070's prototype validated: a catalog flag plus a pre-transform pass in the content loader that captures a rune's pristine body as a source string and empties it, so postProcess can re-parse and transform it per entity with a bound variable. Capture must happen before the page transform — by schema-transform time Markdoc has already resolved the body's $item interpolations to undefined.
high moderate
0/5 criteria
WORK-267 main
contributePages pipeline phase
Add the Plugin.contributePages hook and a contribution phase in the content loader (after file-page registration, before aggregation) that collects ContributedPage[] and runs them through the normal pipeline — the underlying primitive both the entityRoutes adapter and third-party plugins build on.
high complex
0/6 criteria
WORK-340 main
Token hygiene: phantom-token reconciliation + vocabulary cleanup
Lumina's CSS references several colour tokens that are never defined, so each paints a stale literal fallback (a sky-blue from an old default theme, or a cool Tailwind gray) that doesn't track light/dark. This is the real cause of the "out of place" blue (e.g. the typography specimen background) and the cold-gray muted text in dark mode. Fix the drift at the source, reconcile the vocabulary, and keep the configurable shapes (presets, generator, docs) in correspondence.
high moderate
0/9 criteria
WORK-392 main
Multi-site support in refrakt edit
refrakt edit cannot launch in a multi-site project: EditOptions is just port/contentDir/devServer/noOpen, and resolveSite() throws when multiple sites are declared, telling the user to pass --content-dir — which bypasses config resolution entirely, losing plugins, tints, icons, and route rules. Refrakt's own repo (sites main + plan) hits this. Add a --site flag and an in-editor site switcher so the editor works first-class against multi-site configs.
high moderate
0/5 criteria
WORK-393 main
Registry-aware block preview in the editor
In block mode, registry-resolved runes — collection, relationships, aggregate, xref, expand, and data-bound sandbox — render as unresolved sentinel shells with no explanation. They resolve in core postProcess against coreData.registry, which the client-side block renderer never runs; RUNTIME_ONLY_TYPES in block-renderer.ts only placeholders nav*. The server already holds the registry and resolvers (the full-page iframe preview uses them), so render these blocks server-side; where that's not possible, show an honest placeholder instead of an empty shell.
high moderate
0/5 criteria
WORK-052 main
Create-Refrakt Project Type Defaults
medium simple
0/6 criteria
WORK-053 main
CSS Fallback Resolution for Third-Party Packages
medium moderate
0/6 criteria
WORK-056 main
Editor Background Entity Registry
medium complex
0/10 criteria
WORK-057 main
Editor Registry-Powered Autocomplete
medium moderate
0/7 criteria
WORK-096 main
Vite plugin — dev server HMR
Implement hot module replacement for .md file changes during development. When a markdown file is saved, re-transform it and trigger a page update.
medium simple
0/6 criteria
WORK-097 main
Vite plugin — Level 2 cross-page pipeline
Implement the level: 'pipeline' mode that runs the full four-phase cross-page pipeline at build time, enabling breadcrumbs, nav, glossary auto-linking, and other entity-dependent features.
medium moderate
0/11 criteria
WORK-115 main
Migrate community package postTransform uses to declarative config
With WORK-110 through WORK-114 complete, convert the 5 postTransform uses identified in SPEC-033 to their declarative equivalents. Validate identical HTML output before and after each migration.
medium moderate
0/7 criteria
WORK-116 main
Update inspect and contracts tooling for structure slots features
Update refrakt inspect and refrakt contracts to surface the new SPEC-033 features: slot assignments, projection effects, and repeated elements.
medium moderate
0/7 criteria
WORK-265 main
Shared markdoc formatter functions
Register a small set of author-facing markdoc functions — currency, date, number, join — in @refrakt-md/runes as the shared value-formatting layer, usable anywhere markdoc transforms run: collection cells, body templates, and entityRoutes render strings. Keeps formatting out of fields and out of any bespoke projection DSL.
medium simple
0/4 criteria
WORK-269 main
embed() embeddability contract
Generalize SPEC-066's sourceFile + extract into the embed() contract: an entity is embeddable if it has embed() or (sourceFile + extract). expand and the entityRoutes adapter accept either, so external plugins can make entities embeddable without a source file on disk.
medium moderate
0/4 criteria
WORK-341 main
Dark-mode token parity audit
Make dark-mode token coverage deliberate. Most "dark looks off" reports trace to the phantom tokens fixed in WORK-340 (a phantom can't have a dark value); this item closes the genuine remaining gaps and records the intentional shared-token decisions.
medium simple
0/4 criteria
WORK-350 main
Rebuild index composability section as a bento showcase
Capstone + real-world validation. Replace the current split-feature composability section on the site index (a juxtapose of two sandboxes) with a richer bento grid where each cell is a different live rune composition — the section demonstrates composability by being a composition. It doubles as the hero example atop the new Compositions docs category (WORK-346) and as the dogfood proof that the bento substrate works end to end.Now that the v0.20.0 surface model has shipped, the showcase can flex the new surface vocabulary too — so the grid demonstrates both composition axes (a guest in a media zone, and the surface treatment around it).
medium moderate
0/7 criteria
WORK-351 main
Theme-aware global chrome: selection, scrollbars, color-scheme
Three pieces of browser chrome currently ignore the theme. Make them token-driven and mode-aware.
medium simple
0/4 criteria
WORK-352 main
Focus-visible and reduced-motion consistency
Accessibility polish across the theme. Today only ~5 of ~90 rune CSS files define :focus-visible, and only 2 honor prefers-reduced-motion — so keyboard focus is inconsistent and animations don't degrade for motion-sensitive users.
medium moderate
0/4 criteria
WORK-391 main
group-order attribute on collection, aggregate, relationships
Implements SPEC-095: an explicit group-order attribute so authors can sequence groups over a non-enum field (e.g. category, plugin, edge kind), which today render in arbitrary insertion order.
medium moderate
0/7 criteria
WORK-394 main
Close editHints coverage gaps across rune packages
editHints drive click-to-edit in the block editor; every rune without them is one where clicking a section silently does nothing. Coverage today is 93/130 runes (71.5%): business, design, docs, places, and storytelling are at 100%, but core is at 58% (35/60), plan at 45% (5/11), media at 60% (3/5), learning at 67% (2/3), and marketing at 80% (12/15). Close the gaps using the established SPEC-009 playbook (visible elements as refs/data-name, hints declared in the rune's config).
medium moderate
0/5 criteria
WORK-395 main
Surface pipeline warnings in the editor
The engine grew a rich soft-lint system (posture demotion, escape-hatch lints, nesting validation, entity-id collisions) but the editor actively swallows it: runPreviewPostProcess in packages/editor/src/preview.ts collects PipelineWarnings into an array and drops it, and hook errors hit a bare catch {} ("degrade silently"). Authors only discover problems at build time. Pipe warnings through to the UI as a validation rail.This is the warning channel that SPEC-098's inline lints build on.
medium simple
0/5 criteria
WORK-397 main
Relocate bento and bento-cell from marketing to core runes
Execute ADR-019: move bento + bento-cell from @refrakt-md/marketing to core (@refrakt-md/runes + @refrakt-md/lumina) as Layout primitives, with a back-compat re-export shim from marketing. Not a blocker for WORK-350; target a future minor.
medium moderate
0/6 criteria
WORK-439 main
Visual-regression compare-against-base CI job
Deferred from WORK-409 (its final acceptance criterion). The harness runs end-to-end locally and in the pinned Playwright container; what's left is the CI automation, which needs a browser-backed runner to develop against — hence its own item, unassigned to a milestone until a browser CI environment is in place.
medium moderate
0/3 criteria
WORK-058 main
Pipeline Incremental Build Optimization
low complex
0/9 criteria
WORK-098 main
Vite plugin — behavior init helper export
Export a thin initBehaviors() wrapper from @refrakt-md/vite/behaviors that frameworks can call after navigation to re-initialize interactive rune behaviors (accordion, tabs, datatable, etc.).
low trivial
0/6 criteria
WORK-332 main
Remove the legacy data-field engine machinery (Tier 2)
Internal-only cleanup that lands the rest of WORK-323 once WORK-331 has stopped emitting the dual-emit metas. Remove the now-dead legacy read/strip path so data-rune-fields is the engine's only field-data input. No external/contract benefit beyond Tier 1 — this is for a single internal representation and a smaller engine.
low moderate
0/4 criteria
In Progress 2
WORK-051 main
Editor Package Awareness
high complex
3/8 criteria
WORK-089 main
Create @refrakt-md/astro adapter package
Build the Astro framework adapter — the first non-SvelteKit target. Astro is MPA-first and SSG-focused, making it the simplest adapter to build and validate.
high moderate
11/12 criteria
Review 2
WORK-346 main
Rune compositions docs category
The composability investigation surfaced ~25 meaningful rune combinations — far more than fit in the authoring guide. Create a dedicated "Compositions" docs category, page-per-pattern: each page shows the Markdown you write, the rendered result (via preview), and a one-liner on which zone/mechanism makes it work. Start with Family A (a visual rune in a container's media zone), the set being made first-class this milestone.
medium moderate
WORK-380 main
Surface-model showcase gallery
The v0.20.0 surface model shipped with per-rune reference docs (card cover, recipe cover, bg, surfaces.md) but no single page that shows the vocabulary as a system. Build a dedicated showcase gallery that demonstrates the whole surface model on one page — the "wow" surface a visitor lands on to grasp what the model can do — organised by the model's own axes.
medium moderate
Done · 413 archived 30
WORK-525 main
Derive structure contracts from facets
packages/transform/src/contracts.ts independently re-derives what the identity transform emits, from config — it imports types, helpers and merge, and never the engine. So refrakt contracts --check validates the contracts file against its own derivation, not against engine output: any engine change contracts does not mirror produces confidently wrong contracts while CI stays green. Now that the axes are facets, investigate whether each facet can declare its own contract contribution and collapse the two implementations into one.This is the spec's principal open question, and it may not pan out. Time-box the investigation and record the answer either way.
high complex
6/6 criteria
WORK-528 main
Enforce identity fields on theme overrides
packages/transform/src/validate.ts already declares IDENTITY_FIELDS = ['block', 'modifiers', 'sections', 'variants'] and enforces it against SPEC-091 variant deltas — "a delta restructures a rune, never redefines it". The theme-override path does not: mergeRuneConfig shallow-merges { ...base, ...override } with no field restrictions, so a theme can write runes: { Card: { sections: {} } } and silently disable reading on every card in a site.One position, applied to one of two merge paths. This closes the other.
high simple
6/6 criteria
WORK-529 main
Correct section roles — core and marketing runes
Three runes whose sections map is missing a role their layout clearly has. Card is the case that surfaced the whole problem:
high moderate
7/7 criteria
WORK-533 main
Declare join tables in tag modules
Move the schema↔engine join tables out of RuneConfig and into the tag modules that own them, with config referencing the declaration rather than owning it. This is what makes WORK-534 possible: createContentModelSchema needs the gating facts at construction time, and today it has none.
high complex
8/8 criteria
WORK-534 main
Narrow rune schemas to applicable universal attributes
createContentModelSchema merges all ~37 universal attributes unconditionally:
high complex
8/8 criteria
WORK-535 main
Report a rune's actual universal attributes in refrakt reference
refrakt reference card prints:
high simple
8/8 criteria
WORK-538 main
Make prominence effective on runes whose stylesheet pins its title size
prominence works by re-pointing --rf-title-size, which [data-section="title"] reads:
high moderate
7/7 criteria
WORK-539 main
Close refrakt.config.json schema drift and fix config migrate field list
packages/transform/refrakt.config.schema.json is hand-maintained and had drifted from the RefraktConfig / SiteConfig interfaces in @refrakt-md/types. Nothing guarded it, so seven discrepancies had accumulated — fields that exist in the types but are absent from the schema (and therefore missing from editor autocomplete and from the configuration docs), one field the schema advertised that the types no longer have, and two nested objects the schema actively rejected.Separately, refrakt config migrate kept its own hand-copied SITE_FIELDS array, which had drifted from the authoritative one in config-normalize.ts. The two lists describe inverse operations over the same field set — the normalizer mirrors site → top level, the migration moves top level → site — so a divergence strands fields.
high moderate
7/7 criteria
WORK-540 main
Move author-facing pages out of the Extend handbook into Docs
The /docs vs /extend split is sound in principle — extend/index.md states it outright ("If you're here to author content... head to the Docs handbook"). But seven pages sat on the wrong side of the line, and the entity-registry concept had no author-facing home at all.
high moderate
7/7 criteria
WORK-542 main
Backfill the missing descriptions in refrakt.config.schema.json
Only 10 of 22 SiteConfig fields carry a description. These have none:
high moderate
4/4 criteria
WORK-543 main
Per-row templates for the data rune
Give {% data %} an optional body, transformed once per row with $row bound, so a data file can drive arbitrary Markdoc rather than only table cells.
high moderate
10/10 criteria
WORK-544 main
Generate the configuration reference
A repo script flattens refrakt.config.schema.json into a committed JSON artifact; a docs page renders it with {% data %}. The configuration pages stop carrying hand-written field tables.
high moderate
9/9 criteria
WORK-545 main
Add a frontmatter schema
Frontmatter has no machine-readable description. Add packages/content/frontmatter.schema.json, publish it on the versioned routes BUG-004 built, and make Frontmatter derive its documented members from it.
high moderate
8/8 criteria
WORK-547 main
Decide which rune pages should carry an attribute table
Only 13 of ~115 rune pages have an ## Attributes section. Before generating anything, work out why — the answer sets the scope of WORK-548 and nothing sensible can be estimated without it.Two possibilities, with very different consequences:
high simple
6/6 criteria
WORK-548 main
Generate rune attribute tables
Rune pages render their attribute tables from the reference data refrakt reference --format json already produces, instead of hand-copying schemas. Extends scripts/check-rune-docs.mjs from page coverage to page content.
high complex
18/18 criteria
WORK-549 main
A pre-transform include rune
Implement SPEC-129: an {% include %} rune that pastes a file's AST during preprocess, so data and snippet inside it resolve. Unblocks WORK-548's shared-block criterion.
high moderate
11/11 criteria
WORK-550 main
data body as a table row
Extend SPEC-127's per-row body so a body can emit a table row rather than a run of blocks — cells delimited by ---, headers named by a new attribute.
high moderate
9/9 criteria
WORK-553 main
Nested data queries
A {% data %} inside another one's body should resolve, with $row bound to the nearest enclosing query — a correlated subquery, parameterised by the outer row.
high moderate
8/8 criteria
WORK-524 main
Consolidate warn-once diagnostics onto the facet collector
Retire the eight module-level *_WARNED sets in engine.ts, route every engine diagnostic through the facet WarningCollector, and settle the dedupe-scope question the migration deliberately deferred. Also convert the ten test files that currently spy on console.warn into assertions on returned warning data.
medium moderate
7/8 criteria
WORK-527 main
Universal axes are absent from structure contracts
refrakt contracts is documented as describing "the complete HTML structure the identity transform produces for every rune". It does not. Measured across the checked-in contracts/structures.json (132 runes), not one universal axis appears:
medium moderate
8/8 criteria
WORK-530 main
Correct section roles — storytelling runes
Six runes in plugins/storytelling, in two families of three that will almost certainly resolve the same way as each other:
medium moderate
8/8 criteria
WORK-531 main
Correct section roles — media and places runes
The two remaining slot/role mismatches, in different plugins and unrelated to each other:
medium simple
7/7 criteria
WORK-532 main
Lint slot/role mismatches
The twelve corrections in WORK-529–WORK-531 were found by an ad-hoc script comparing each rune's declared slots (from layout, structure, autoLabel, blocks, contentWrapper) against its sections map. Nothing stops the same drift returning the next time a rune gains a body slot.Turn that comparison into a standing check.
medium simple
7/7 criteria
WORK-536 main
Warn when reading, content-place or cover scrim are dropped
Of the seven gated universal axes, four report when they are dropped and three say nothing:
medium simple
8/8 criteria
WORK-537 main
Separate the prose capability from the body role
body carries two meanings that were merged by accident of timing:
medium moderate
8/8 criteria
WORK-541 main
Split the config types out of theme.ts
RefraktConfig, SiteConfig, PlanConfig, XrefPattern, EntityRoute, and RouteRule live in packages/types/src/theme.ts, which is not about themes. Move them to config.ts, leave the theme-system types behind, and stop index.ts re-exporting the whole batch under one // Theme system types comment.The file was created by c3fe915 (v0.25.0), a mechanical split of one types module into fifteen files. The same commit left packages/types/src/types.ts as a zero-line file that is still empty and still unreferenced.This matters because SPEC-126 claims the docs are generated from the schema and the schema is drift-tested against the types. A reader following that chain should not land in a file whose name says it is about something else.
medium simple
7/7 criteria
WORK-546 main
Generate the frontmatter reference and trim the configuration prose pages
The last part of SPEC-126: point the generator at the frontmatter schema, and delete the hand-written field tables the generated references replace.
medium simple
7/7 criteria
WORK-551 main
An inline code rune
An inline rune that renders its body as code, so a variable can be code-styled. Backticks cannot do it: a code span is literal by definition, so the Markdoc syntax inside one is never parsed.
medium simple
6/6 criteria
WORK-552 main
Suppress an accordion's schema.org emission
{% accordion schema="none" %} emits no structured data — not on the accordion, not on its items.Narrow on purpose. The general answer is SPEC-130; this is the one value that is needed now, and "none" stays valid under whatever that spec settles, so shipping it forecloses nothing.
medium simple
8/8 criteria
WORK-526 main
Let facets declare their own author attributes
transformRune still strips consumed author attributes from pass-through output using a fixed list naming eight facet-owned axes:
low simple
6/6 criteria