WORK-434
Setting up your dashboard 0 entities found · 8/33 branches scanned
ID:WORK-434Status:ready

Motion dimension — docs + showcase

SPEC-105 §7 + docs: a theme-authoring motion dimension page and an author-facing reveal/stagger reference, plus a feature-stagger demonstration.

Priority:mediumComplexity:moderateMilestone:v0.24.0Source:SPEC-105

Criteria completion

Criteria completion: 0 of 3 (0%) checked; tracking started on Jun 15, no incremental history yet0%25%50%75%100%Jun 15Jun 15

Tracking started Jun 15 — check back for trends.

Scope

  • Theme-authoring page — the motion dimension: the closed vocabulary, the per-character character contract (what a theme must preserve vs is free to vary), the physics tokens, and how to choreograph across a rune's named parts (sync vs offset) — including the author-intent / theme-choreography / JS-when / CSS-how principle.
  • Author referencereveal="none|fade|slide|scale|blur" and stagger, with the opt-in default and the reduced-motion behaviour; a feature/bento stagger example.
  • Showcase — a section that exercises reveal + stagger (a feature grid cascading in), demonstrating the global coverage and the reduced-motion/no-JS complete-render fallback.

Acceptance Criteria

  • A theme-authoring motion-dimension page documents the vocabulary, the character contract, the physics tokens, and choreography over named parts.
  • An author-facing reveal/stagger reference documents the values, the opt-in default, and reduced-motion behaviour, with a feature-stagger example.
  • A working showcase shows a cascading feature/bento; reduced-motion and no-JS render the complete static section; contracts green and CSS coverage passes.

Dependencies

  • WORK-431, WORK-432, WORK-433 — documents and demonstrates the whole dimension.

References

  • SPEC-105 §7 · site/content/extend/theme-authoring/dimensions.md · author rune reference docs.