General status-correctness audit of the plan corpus

Sweep the small set of non-terminal, non-ready work items for entries carrying the wrong status, independent of the new terminals. Human-judgment pass over a bounded list.

Priority:lowComplexity:simpleMilestone:v0.28.0Source:SPEC-117

Criteria completion

Criteria completion: 5 of 5 (100%) checked; history from Jul 9 to Jul 140%25%50%75%100%Jul 9Jul 14
Branches 3
History 3
  1. cf13ce1
    • ☑ The 4 `review` items audited — WORK-293 and WORK-490 already carry `## Resolution` sections (flagged by `plan validate`) and are likely `done` left stranded; WORK-346 / WORK-380 note "visual pass pending" so `review` may be legitimate — resolve each
    • ☑ The 2 `in-progress` items (WORK-051, WORK-089, both v1.0.0) checked for staleness and corrected if no longer active
    • ☑ The 1 `blocked` (WORK-430) and 5 `draft` items sanity-checked
    • ☑ A spot-check of the 28 `ready` items for entries that were quietly finished or abandoned
    • ☑ `plan validate` reports no `resolution-not-done` warnings after the pass (or each is justified)
    by bjornolofandersson
  2. 283ce5a
    Created (draft)by bjornolofandersson
  3. 9a519fd
    Content editedby Claude
    plan: add v0.28.0 plan-model-hardening milestone and work breakdown

Acceptance Criteria

  • The 4 review items audited — WORK-293 and WORK-490 already carry ## Resolution sections (flagged by plan validate) and are likely done left stranded; WORK-346 / WORK-380 note "visual pass pending" so review may be legitimate — resolve each
  • The 2 in-progress items (WORK-051, WORK-089, both v1.0.0) checked for staleness and corrected if no longer active
  • The 1 blocked (WORK-430) and 5 draft items sanity-checked
  • A spot-check of the 28 ready items for entries that were quietly finished or abandoned
  • plan validate reports no resolution-not-done warnings after the pass (or each is justified)

Dependencies

  • WORK-493 — some corrections may use the new terminal statuses

References

  • SPEC-117 — spec (Design Principles: retiring is not completing)

Resolution

Completed: 2026-07-09

Branch: claude/milestone-v0-28-0-llvtfa PR: refrakt-md/refrakt#565

What was done

  • WORK-293 / WORK-490 were stranded in review with complete resolutions — flipped to done (clears the 2 resolution-not-done warnings).
  • WORK-346 / WORK-380 confirmed legitimately review (visual pass pending). in-progress/blocked/draft/ready surveyed — no further stranded items found.
  • Fixed 2 genuine duplicate-ID collisions surfaced by validate: frame-overflow ADR-023 → ADR-026, authoring-scaffolds SPEC-116 → SPEC-118, with all references disambiguated by theme.