Insights
Cycle time distribution
Time from first non-draft status to completion, across 130 completed items.
Throughput trend
Completions over the full history, bucketed weekly.
Complexity calibration
Actual cycle time by planned complexity — is simple really simple? Are complex items over- or under-called?
Not enough tagged items yet (11 of 20 needed). The distribution gets reliable once more items have been completed with a complexity set.
Spec status flow & fan-out
Every spec with at least one derived work item, with its current status breakdown and a miniature status-flow chart showing how items moved through statuses over time.
SPEC-008 Unbuilt Runes — High-Level Spec
13 items 0% done
- pending 13
SPEC-041 Agent Rune Reference
8 items 100% done
- done 8
SPEC-031 Vite Plugin — Framework-Agnostic Rune Integration
6 items 0% done
- ready 5
- in-progress 1
SPEC-001 Community Runes — Specification
4 items 0% done
- ready 3
- in-progress 1
SPEC-002 Cross-Page Pipeline — Specification
4 items 0% done
- ready 4
SPEC-033 Structure Slots and Declarative Flexibility
2 items 0% done
- ready 2
SPEC-013 Multi-Framework Support: Layout Transform Architecture
1 item 0% done
- in-progress 1
SPEC-027 Work Item Resolution Summaries
1 item 100% done
- done 1
SPEC-030 Framework Adapter System
1 item 0% done
- in-progress 1
SPEC-042 Plan Target for create-refrakt
1 item 100% done
- done 1