Insights

Insights

Cycle time distribution

Time from first non-draft status to completion, across 116 completed items.

Cycle time distribution across 116 completed items.021426384<1d: 101<1d1011–3d: 51–3d3–7d: 53–7d1–2w: 01–2w2–4w: 42–4w1–2mo: 11–2mo60d+: 060d+

Throughput trend

Completions over the full history, bucketed daily.

Throughput trend: 116 completions across 61 days, 1 series.05101520May 31Jun 12Jun 24Jul 6Jul 18Jul 30overall: 7 on 2026-05-31overall: 15 on 2026-06-02overall: 14 on 2026-06-03overall: 4 on 2026-06-05overall: 3 on 2026-06-11overall: 6 on 2026-06-15overall: 6 on 2026-06-16overall: 21 on 2026-06-24overall: 16 on 2026-06-26overall: 5 on 2026-06-30overall: 19 on 2026-07-14

Complexity calibration

Actual cycle time by planned complexity — is simple really simple? Are complex items over- or under-called?

No completed items with a complexity tag yet. Tag work items as simple, moderate, or complex to track estimation calibration.

Spec status flow & fan-out

Every spec with at least one derived work item, with its current status breakdown and a miniature status-flow chart showing how items moved through statuses over time.